Underdeck Solution
TODO TODO
Summary
Asset: Connel Bridge, Scotland'
Benefits: Significant reduction in road closures due to reduction in material.
Engineering: 3kN/m2 UDL
Scope: Extensive bridge repairs.
Location: Underdeck
Operator: Transport Scotland
Designed to 3kN UDL/m2 with wind speeds of 44m/s
Description
2,200m2 of access was required for installation of new road deck, steelwork repairs and coating application to road bridge. This project lasted for 4 years so the system experienced 4 full winters of Scottish West coast storms. V-Deck™ provided a very time and cost effective solution compared to suspended scaffolding. The V-Deck™ solution was designed to take wind speeds up to 44m/s and a 3kN UDL. The significant reduction in road closures was a big benefit as a road closure forces road users on an 85m round trip. The installation team was achieving 85m2 per day with a 5 man team.'
Tel: +44 (0) 131 554 6124
info@vtsltd.uk
Copyright © 2025 Velo Tech Systems Ltd.