Back
Underdeck Solution
Arch and Modular

Summary
Asset: Queen Elizabeth Bridge
Benefits: Significant reduction in road closures due to reduction in material.
Engineering: 3kN/m2 UDL
Scope: Extensive bridge repairs.
Location: Underdeck
Operator: Transport Scotland
Eliminated Road Closures
Description
Access was required for access to the bridge joints and a few areas of underdeck for concrete repairs. V-Deck™ is a modular system so was able to be designed to provide access only to those areas that required it. See the V-Deck™ installed with two fingers and bridge in the photo above. The project required the navigable channel to be kept open for boat traffic. It was difficult to achieve this with scaffolding however V-Deck™ was easily able to achieve this with its’ slimline profile.