Asset: British Steel Plant
Benefits:
Engineering: 2kN/m2 UDL
Scope: Maintenance works
Location: Various locations including BOS tank
Operator:
Description
V-Deck™ was required for a variety of work scopes within British Steel assets to replace all scaffolding on site wherever possible. V-Deck™ was used for access to vertical pipe work and in the BOS Vessel casting pot.