Boilers
Mid-Level
TODO
Summary
Asset: Uniper Power Station
Benefits: 2.6t of V-Deck™ compared to 36t of scaffolding\nV-Deck™ lifted and lowered up to work location
Engineering: 120m2 of 1kN/m2 UDL
Scope: Ceramic welding repairs
Location: Burners at 35m level
Operator: Uniper
88% Time Savings Compared to Scaffolding
Description
Client required a 120m² access platform to provide four levels to the internals of a boiler for welding repairs. The client required a platform at the 35m level in order to gain access to the burners. The boiler is 25m wide by 76m deep. It is tapered at the bottom presenting an additional problem if the client had chosen scaffolding as the solution. The V-Deck™ was suspended off VTS Dyneema ropes. For very long drops, this rope is ideal for manual handling reasons in this 76m high boiler. The Dyneema ropes ensured that the overall weight of the platform was minimised.'