Boilers
Multiple Levels
TODO
Summary
Asset: Onyx Power Station
Benefits: V-Deck™ was jacked up to 3m away from the walls to allow for the removal and reinstatement of tubing panels\nV-Deck™ lifted and lowered up to work locations on all four internal walls.
Engineering: 2.5kN/m2 UDL
Scope: Fabric maintenance using V-Deck™ and cradles
Location: Under the hanging coils at top of 76m high boiler
Operator: Onyx
96% Time Savings Compared to Scaffolding
Description
Access was required for specialist welding repair works to all 4 internal faces of a 75m high boiler. A 10 level V-Deck™ tower provided access to the full width of the 5 level V-Deck™. The V-Deck™ raised and lowered up and down the structure to provide access to all areas on the internal walls. The V-Deck™ was jacked up to 3m away from the walls to allow for the removal and reinstatement of tubing panels.