Boilers
Encapsulated Multiple Level
TODO
Summary
Asset: Uniper Power Station
Benefits: Full encapsulation was required for containment of grit and debris.
Engineering: 2.5kN/m2 UDL
Scope: Blasting and Non Destructive Testing
Location: Full height of boiler wall
Operator: Uniper
87% Time Savings Compared to Scaffolding
Description
Access was required for grit blasting and Non Destructive Testing on over one thousand inspection points on the boiler wall. Full encapsulation was required to contain the grit and debris. It is very simple to fully encapsulate V-Deck™ to create a tight fit
Tel: +44 (0) 131 554 6124
info@vtsltd.uk
Copyright © 2025 Velo Tech Systems Ltd.