Summary
Asset: DPPA
Benefits: There was limited safety boat cover required
Engineering: 96m2 engineered to 1.5kN/m2 UDL
Scope: Client required access to underdeck of DPPA for PFP repairs
Location: Underdeck
Operator: Spirit Energy
Reference
Great time savings
77% Time Savings Compared to Scaffolding
Description
Access was required for underdeck Passive Fire Protection Repairs. The reduction in installation man hours mean that there was a big reduction in the overside safety boat cover requirement